JK Environmental has installed a set of six S6ng 7.5 tonne heavy duty mobile column lifts, from Somerstotalkare, at its the Hertfordshire depot.
The environmental solutions firm has four depots and a fleet of 42 vehicles, ranging from vans to articulated vehicles.
Depot manager Steve Walker says he needed the lifts to improve workshop efficiency, and will use them to assist with monthly HGV vehicles inspections, as well as repairs and service.
"Our fitters liked the idea of using mobile lifting equipment to maximise workshop space when the lifts aren't in use. We looked at a number of different heavy-duty lifting equipment suppliers and felt that Somerstotalkare's S6ng was the best product for us," he says.
He also points to the fact that these lifts are easily manoeuvrable and automatically synchronise.